Pakistan construction rates index — 2026

A dated, sourced reference for construction rates in Pakistan in 2026 — the same material and trade rates that power our cost calculator. Baseline figures are for Lahore; other cities vary by a few percent. Free to cite with a link back.

Rates last updated: 21 August 2026 · Prepared by the Finishes.pk estimating team · Next review: monthly

Material rates

MaterialRateUnitRangeSource
CementPKR 1,45050kg bag1,350–1,600source
Steel / sariaPKR 262kg258–265source
A-class bricksPKR 17,0001000 bricks16,500–22,000source
SandPKR 60cft52–90source
Crush / bajriPKR 175cft95–330source

Grey-structure rates (per sq ft of covered area)

TradeRateBasisRangeSource
Foundation & substructurePKR 520per sq ft covered460–600source
RCC frame, slabs & columnsPKR 1,640per sq ft covered1,400–1,750source
Brick masonry & base plasterPKR 850per sq ft covered700–900source

Finishing rates

TradeRateBasisRangeSource
Finish plaster, putty & paintPKR 95per sq ft of painted surface75–130source
Flooring We supplyPKR 300per sq ft150–750source
Wall panelling (PVC / WPC / fluted) We supplyPKR 320per sq ft panelled150–630source
False ceiling We supplyPKR 300per sq ft of ceiling250–400source
Wardrobes, kitchen & MDF/HPL work We supplyPKR 1,520per sq ft of cabinet face1,100–2,500source
Doors & framesPKR 22,000per door (leaf + frame + hardware)13,000–45,000source
Electrical wiring & fixturesPKR 255per sq ft covered180–350source
Plumbing & sanitaryPKR 225per sq ft covered150–320source
Kitchen & bathroom tilingPKR 260per sq ft tiled180–450source

How to use these rates

Grey-structure trades are charged per square foot of covered (constructed) area — multiply the rate by your total built area across all floors. Finishing trades are charged on their own quantity: flooring and false ceiling on area, wall panelling on the panelled area, woodwork on cabinet face area, and doors per unit. The easiest way to combine them is the construction cost calculator, which does the arithmetic and applies your city and finish quality automatically.

Methodology & licence

Figures are surveyed from Pakistani construction-industry and materials-supplier sources (linked against each row) and cross-checked against real builder quotes for whole-house totals. Where sources disagree we take a mid-range value and record the range. These rates are a planning reference and move with the market; confirm a firm quote before ordering. This index is free to cite and reuse with attribution — please credit Finishes.pk and link back to this page.

⬇ Download these rates as an Excel estimator (.xlsx)

Frequently asked questions

Monthly. Every rate carries its source and the date it was last checked, and the whole index is dated at the top. Because cement, steel and imported finishes move with the exchange rate, we re-survey the figures regularly rather than letting them go stale.

The baseline figures are Lahore rates. Other cities run a few percent above or below on labour and transport — Islamabad and Karachi higher, south Punjab and Faisalabad lower. The cost calculator applies a city adjustment automatically.

Yes, with attribution. These are published as a market reference. If you cite a figure, please credit Finishes.pk and link back to this page. You can also embed the live cost calculator on your own site.

They are surveyed from Pakistani construction-industry and materials-supplier sources, listed against each line as a source link, and cross-checked against real builder quotes for whole-house totals. Where sources disagree we take a mid-range figure and record the range.