Call +92 308 4003555WhatsApp Us
ProductsWall Panels
PVC Wall PanelsFluted Wall Panels3D Wall PanelsWood PanelingStone Panels
FlooringCeilingAcoustic PanelsMDF & HPL Sheets
ZRK Sheet Price ListLasani Sheet Price
PVC SheetsLamination SheetsWall CladdingWall MouldingMedia WallWallpaperTilesUV SheetsKitchen CabinetsKitchen AppliancesCountertopsWardrobesBathroom FittingsSanitary WareBathroom VanityDoorsDoor LocksHardware & ToolsCurtainsBlindsLightingElectricalSmart HomeHome DecorSafes & Lockers CalculatorsConstruction Cost Calculator5 Marla House10 Marla House1 Kanal HousePVC Wall Panel CostFalse Ceiling Cost Areas We Serve
DHA LahoreBahria TownGulbergModel TownJohar TownLahore CanttWapda TownAskariIqbal TownGarden TownFaisal TownTownshipValencia TownRaiwind RoadLDA AvenueAllama Iqbal TownCavalry GroundMM Alam Road
CompanyServicesProjectsAbout UsBlogContact

Kitchen Hood Ductwork Materials and Parts: Aluminium, Galvanised and Stainless Ducts, Elbows, Reducers, Clamps, Flap Caps, Fire Safety, Grease Traps and Costs in Pakistan

Kitchen hood ductwork is the set of pipes and fittings that makes a duct run, and the materials you choose affect safety, noise and how long the system lasts, especially with grease and heat from Pakistani cooking. This page covers aluminium, galvanised and stainless ducts, elbows, reducers, clamps, flap caps, fire safety, grease traps and costs. For route and size planning see kitchen hood ducting, for hoods see electric hoods and for cleaning see how to clean a kitchen chimney.

Duct materials

  • Flexible aluminium. Cheap and easy to fit, but ribbed and noisy.
  • Rigid aluminium. Smooth, light and corrosion resistant.
  • Galvanised steel. Strong and common in rigid ducts, can rust if damaged.
  • Stainless steel. The longest lasting and most hygienic, costs more.
  • PVC duct. Only for non-heat zones, not recommended near the hob.
Installer tightening a clamp on a joint between two rigid duct sections, work light
Installer tightening a clamp on a joint between two rigid du

Typical costs

These ranges show common retail figures for parts.

PartIndicative range
Flexible aluminium duct, per metrePKR 300 - 900
Rigid aluminium duct, per metrePKR 600 - 1,800
Galvanised rigid duct, per metrePKR 700 - 2,200
Stainless steel duct, per metrePKR 1,500 - 4,500
Elbow or bend, eachPKR 300 - 1,500
Reducer or adapter, eachPKR 250 - 1,200
Clamps and sealantPKR 300 - 1,500

Prices move with brand, model, size and stock. Use these ranges to judge a quote, then compare the exact model and what is included.

Fittings

Use smooth elbows rather than sharp corners, a reducer only where unavoidable, and clamps with sealant or foil tape at every joint. Choose a flap cap with a bird guard at the outlet. Keep fittings few to protect airflow.

Cutaway of a duct with a small grease trap tray at a low point, close-up
Cutaway of a duct with a small grease trap tray at a low poi

Fire safety

Grease can catch fire in ducts, so use non-combustible metal near the hob, keep the run short and clean it regularly. Avoid plastic duct near heat. Do not route ducts through concealed combustible spaces without protection. Fit a metal section near the hood.

Grease control

A baffle filter in the hood catches most grease. A small drip tray or trap at a low point catches condensed oil. Check and empty it. Regular cleaning of the first section of duct keeps buildup down.

Fixing and support

Support long runs with clamps every metre, and keep the duct from touching walls, pipes and cables. Seal around the wall opening against dust and insects. A neat fixing reduces rattles and vibration noise.

What to check before buying

  • Material. Rigid metal near the hob.
  • Diameter. Matching the hood.
  • Joint sealing. Clamps and sealant.
  • Warranty. For parts and labour.

Before you decide

Choose rigid metal duct for the hob area, use few and gentle bends and seal all joints. Ask the fitter which materials are used and why. Good ductwork is hidden once finished, so quality matters more than looks. Fixed plumbing and gas work should be done by a licensed plumber or gas fitter.

Frequently Asked Questions

Flexible or rigid aluminium, galvanised steel and stainless steel. Rigid metal is best near the hob. Ask for the specification in writing so you can compare quotes on the same basis. Check the warranty terms and who honours them before you pay.

Rigid aluminium or galvanised duct is about PKR 600 to 2,200 per metre, stainless about PKR 1,500 to 4,500 per metre, with bends about PKR 300 to 1,500 each. Check the warranty terms and who honours them before you pay. Measure carefully and confirm sizes with the seller before ordering.

It is cheap and easy but ribbed, so it adds noise and resistance. Use rigid duct where possible. Measure carefully and confirm sizes with the seller before ordering. Rates and stock change, so confirm the current position before you commit. If you are unsure, send a photo and the measurements and we will advise.

Not near the hob or heat. Use non-combustible metal. Rates and stock change, so confirm the current position before you commit. If you are unsure, send a photo and the measurements and we will advise. Ask for the specification in writing so you can compare quotes on the same basis.

A small trap or drip tray at a low point helps catch condensed grease and should be emptied regularly. If you are unsure, send a photo and the measurements and we will advise. Ask for the specification in writing so you can compare quotes on the same basis.

Message us on WhatsApp with what you need and where it will be used. We check what we can supply and send a written rate showing the model, quantity, warranty and delivery, so you can judge it against other offers. Rates and stock change, so confirm the current position before you commit.

Choosing duct parts?

Send the details and a photo. We reply with a written rate.